Probabilistic Analysis On Levelized Unit Electricity Cost (Luec) Calculation Of Small Medium Reactor Nuclear Power Plant (Smr Npp) In Indonesia

Abstract

SMR NPP is an alternative to overcome the dependency to diesel power plant especially in outside Java Bali system. Economic analysis is a crucial thing that should be done prior to any investment decision on the SMR NPP project and generally done by calculation of Levelized Unit Electricity Cost (LUEC). NPP projects, include SMR, are vulnerable to a number of uncertainty variables. The goal of this study was to perform economic analysis of SMR NPP project with capacity 2 x 100 MWe in Indonesia by incorporating an amount of uncertainty variables, namely the probabilistic approach. The research method is calculating LUEC with deterministic approach followed by the probabilistic approach. Probabilistic approach is done by simulating the effect of uncertainty variable on LUEC using Monte Carlo simulation technique. The results show that the deterministic approach with a discount rate of 10% obtained LUEC at 12.87 cents US$/kWh. Whereas the probabilistic approach obtained LUEC of 13.10 plus minus 1.43 cents USD/kWh at a discount rate of 10% and amounted to 8.11 plus minus 0.88 cents USD/kWh at a discount rate of 5%.  calculation in deterministic approach was  12.87 cents USD/ kWh. While LUEC as the results of uncertainty variables simulation on probabilistic approach were 13.10 ± 1.43 cents USD/ kWh on discount rate 10% and 8.11 ± 0.88 cents USD/kWh on discount rate 5%. Occurrence probability of LUEC is less than 13 cents USD/kWh (benchmark value) was about 100% on discount rate of 5% and  50% on discount rate of 10%.[P1] 

 [P1]Revised sentence

References
[1] PT PLN (Persero), “Statistik PLN 2013”, Sekretariat Perusahaan PT PLN (Persero), Jakarta, ISSN No. 0852-8179, (Mei 2014)



[2] IEA/NEA, “Current Status, Technical Feasibility and Economics of Small Nuclear Reactors”, OECD, Paris, ( Juni 2011)

[3] LOCATELLI, G. dan MANCINI, M., “Small-medium Sized Nuclear, Coal and Gas power plant: A Probabilistic Analysis of Their Performances and Influence of CO2 Cost”, Energy Policy, 38, pp. 6360-6374, (2010).



[4] PETROVIC, B., RICOTTI, M., MONTI, S., CAVLINA, N. dan NINOKATA, H.,”Pioneering Role of IRIS in the Resurgence of Small Modular Reactors”, Nuclear Technology, Vol. 178, No. 2, pp. 126-152, (2012).


[5] REYES, J. dan LORENZINI, P.,“NuScale: A Modular, Scalable Approach to Commercial Nuclear Power”, Nuclear News, (2010).

[6] BOARIN, S. dan RICOTTI, M., “Research Article: An Evaluation of SMR Economic Attractiveness”, Hindawi Publishing Corporation, Science and Technology of Nuclear Installations, Volume 2014, Article ID 803698, (2014).



[7] BLACK & VEATCH, “Levelized Cost of Energy Calculation, Methodology and Sensitivity”, http://csep.efchina.org/Levelized Cost of Energy Calculation_BV_EN.pdf. Accessed on 18 February 2014.


[8] RODE, et al.,”Montecarlo Methods for Appraisal and Valuation: A Case Study of a Nuclear Power Plant”, CEIC Working Paper 01-01, Carnegie Mellon Electricity Industry Centser, Carnegie Mellon University, Pittsburgh, (2001).


[9] FITRIANI, H. et al., “Kajian penerapan model NPV-at-risk sebagai alat untuk melakukan evaluasi investasi pada proyek infrastruktur jalan tol”, Jurnal Infrastruktur dan Lingkungan Binaan Vol. II No. 1, Hal. 1-12 ( Juni 2006).


[10] FERETIC, D., & TOMSIC, Z.,”Probabilistic analysis of electrical energy cost comparing: Production costs for gas,coal and nuclear power plants”, Energy Policy,33, pp. 5-13, (2005).

[11] Roques, A. et al., “Using probabilistic analysis to value power generation Investment under uncertainty”, EPRG 065, Electricity Policy Research Group (EPRG), University of Cambridge, England, (2006).



[12] NURYANTI, “Studi Kelayakan Finansial Proyek PLTN di Indonesia dengan Memasukkan Unsur Ketidakpastian”, Thesis, Fakultas Teknik Universitas Indonesia, (2012).

[13] NURYANTI, dkk., “Analisis Probabilistik Pada Perhitungan Biaya Pembangkitan Listrik Teraras PLTN”, Jurnal Pengembangan Energi Nuklir, Volume 14 No. 1 Hal. 23-33, Jakarta (2012).


[14] PUSLITBANG PT PLN (Persero) dan PPEN-BATAN, “Laporan Akhir: Studi Ekonomi, Pendanaan dan Struktur Owner dalam Rangka Rencana Persiapan Pembangunan PLTN Pertama di Indonesia”, PLN, Jakarta (2006).


[15] HOLTON, Glyn A., Value-at-Risk: Theory and Practice, 2nd ed, E-book at http://value-at-risk. net, Accessed on 4 February 2012

[16] SRIDADI, B.,”Pemodelan dan Simulasi Sistem: Teori, Aplikasi dan Contoh Program dalam Bahasa C”, Penerbit Informatika, Jakarta, (2009).


[17] TJONG, W., F., “Aplikasi Statistik Ekstrim dan Simulasi Monte Carlo dalam Penentuan Beban Rencana pada Struktur dengan Umur Guna Tertentu”, Dimensi Teknik Sipil, Vol. 3, No. 2, September 2001, Hal. 84-88 (2001), ISSN 1410-9530.


[18] IEA/NEA, “Projected Cost of Generating Electricity (2010 Edition)”, OECD, Paris, (2010)


[19] BLANK & TARQUIN, “Engineering Economy”, 6th, Mc Graw Hill, Singapore, (2008)


[20] IAEA,”Mini G4 Econs Software”, IAEA, Vienna, (2008)


[21] PALISADE CORPORATION,”Guide to using @Risk: Risk Analysis and Simulation Add-In for Microsoft Excel Version 5.5”, (May 2009)

[22] PT PLN (Persero), PT LAPI ITB & JAPC,”Feasibility Study for Bangka Nuclear Power Plant Project – Non Site aspect”, (2013)


[23] BANK INDONESIA, “Foreign Exchange Rate in Year 2012”, http://www.bi.go.id/ [Accessed on 01 June 2014]

[24] OECD, “Commercial Interest Reference Rate (CIRRs)”,www.oecd.org/tad/xcred/cirrs.pdf. [Accessed on 01 June 2014]


[25] ______ ,”Power Capital Cost Index (PCCI) North America”, http://www.ihscera.com/ [Accesed on 05 Mei 2014]

[26] ABDULLA, A. & AZEVEDO, I. L., “Developing a Range of Levelized Cost Estimates for Integral Light Water Small Modular Reactor”, www.andrew.cmu.edu, [Accessed on Mei 2014]



[27] US DEPARTMENT OF ENERGY, “SMR Financing and Economics, The Nuclear Option: Is Small Scale Nuclear Energy an Option for Alaska?”, December 2010

[28] ONO, K., “Generation IV International Forum Economics Assessment Methodology and Application”, GIF-INPRO Interface Meeting, Vienna, March 1, 2013


[29] ROTHWELL, G., “The Economics of Future Nuclear Power: An Update of The Economic Future of Nuclear Power (2004), a Study Conducted at the University of Chicago”, Stanford University, (2011)


[30] _______,”The Economics of Nuclear Power,Updated August 2013”, http://www.world-nuclear.org/info/inf02.html [Accessed on 15 Desember 2013]

[31] YE, S. & TIONG, R.,”NPV at risk method in infrastructure project investment evaluation, Journal of Construction Engineering and Management, Vol. 126, No. 3 pp. 227-233 (May/ June 2000), ISSN 0733-9634/00/0003-0227–0233.



[32] THOMAS, S.,”The economic of nuclear power: An update”, Berlin: Heinrich-Böll-Stiftung, March 2010, http://www.psiru.org/ [Accessed on 03 Februari 2012]

[33] SUPRANTO, J., “Statistik: Teori dan Aplikasi, Jilid 1”, Edisi 7, Penerbit Erlangga, Jakarta, (2009)