[1]
Nabila Yusna, S., Suharyanto, A. and Wijatmiko, I. 2024. Scheduling Analysis with Monte Carlo Simulation and Statistic Method on a Building Construction Project. KnE Social Sciences. 9, 10 (Mar. 2024), 278–291. DOI:https://doi.org/10.18502/kss.v9i10.15734.