[1]
Junianto, N. and Oginawati, K. 2018. Implementation of Performance Shaping Factor (PSF)-based Risk Assessment and Human Error Assessment and Reduction Technique (HEART) at the ITB Student Dormitory Building C and D Construction Project. KnE Life Sciences. 4, 5 (Jun. 2018), 414–423. DOI:https://doi.org/10.18502/kls.v4i5.2572.